UCF Baseball Stadium Expansion This project included CPC as a member of Skanska USA’s team in its remodeling of the baseball stadium at the University of Central Florida in east Orlando. UCF boasts the second largest student population in the United States, and...
South Bay to Southern Glades Citrus Pipeline Expansion CPC Group (Carnahan Proctor & Cross) was responsible for establishing the survey baseline, staking the pipeline route, as-built surveys, control, and surveys and legal descriptions over private property. CPC...
I-95 Expansion-Treasure Coast This FDOT project includes Corradino serves as the Florida Department of Transportation’s (FDOT’s) Oversight Construction, Engineering and Inspection (CEI) firm on the $78.3 million I-95 expansion on the Treasure Coast. Construction...
I-95/SR-9, North of SR-60 to Indian River /Brevard County Line CPC is providing control survey for this 12.5-mile, FDOT project that adds one general purpose lane in each direction on the existing median throughout the project limits, along with milling/resurfacing of...
City of Titusville Sisson Road Water Main Extension CPC provided design and as-built surveying services for this project to provide domestic water and fire water services to serve 10 single family homes. It included the construction of 2,179 LF of 12-inch water main,...