Osceola County FDOT LAP Fortune to Lakeshore Multi-Use Path

Recent Project Showcase

SR 834 Sample Rd / SR 7 US 441 / SR 814 Atlantic Blvd

Construction Engineering and Inspection

FDOT D4 US1 Hallandale Beach and Hollywood

Transportation & Traffic Engineering
State / FDOT

FDOT D4 SR 714/SW Martin Highway from Martin Downs Blvd to Citrus Blvd

Construction Engineering and Inspection
State / FDOT

FDOT D5 Robinson Street Study

3D Laser Scanning & Modeling
State / FDOT

FDOT D5 I-4 Ultimate

3D Laser Scanning & Modeling
State / FDOT

SR 997/Krome Avenue South

Construction Engineering and Inspection
State / FDOT

FDOT District 4 CR 510 Project in Indian River County

Construction Engineering and Inspection
State / FDOT

City of Delray Beach North Swinton Avenue Improvements

Construction Engineering and Inspection

Osceola County FDOT LAP Fortune to Lakeshore Multi-Use Path

Client:
Industry Type:

The County selected CPC for this $9M project consists of the construction of a 10-foot wide multi-use trail that will run along Fortune Road/East Lakeshore Boulevard from the intersection of U.S. Highway 192 to the existing City of St. Cloud Lakefront Regionally Significant Trail, just west of the intersection at East Lakeshore Boulevard and Columbia Avenue. The total project length is approximately 7 miles. The project will include new trail construction, removal of existing sidewalk, a pedestrian bridge over the St. Cloud Canal and drainage improvements to include construction of ditches and storm drains, intersection improvements at signalized intersections (U.S. 192, Shake Rag Road, Bill Beck Boulevard, Lakeside Drive, and Partin Settlement Road), and improvements to pedestrian crossings at non-signalized intersections to ensure safety of multiple users and connectivity to a larger pedestrian network. The work is a Federal-aid funded project through the Florida Department of Transportation (FDOT) Local Agency Program (LAP). Existing crosswalks will be restriped at 11 locations where the trail crosses a side street. Five new crosswalks will be added along Fortune Road and Lakeshore Boulevard. The new pedestrian bridge over the C-31 Canal will be 145 feet long and 10 feet wide, with 40-45 foot-long ramps on either end and guardrails along both the bridge and the ramps.