Henry E. Rohlsen Airport, Terminal Upgrades

Recent Project Showcase

Seminole Hard Rock Hotel & Casino Hollywood Winner’s Way Garage Expansion

3D Laser Scanning & Modeling
Hospitality

Galt’s Landing, Osceola County

Aerospace

NASA Kennedy Space Center Mobile Launcher 2

Metrology Services
Aerospace

Patrick Space Force Base Beach Renourishment Project

Geomatics / Surveying and Mapping
Aerospace, Federal

NASA Kennedy Space Center 39B Flame Deflector & Trench Upgrades

3D Laser Scanning & Modeling
Aerospace, Federal

FDOT D5 Robinson Street Study

3D Laser Scanning & Modeling
State / FDOT

Moffitt Cancer Center

3D Laser Scanning & Modeling

FDOT D5 I-4 Ultimate

3D Laser Scanning & Modeling
State / FDOT

Henry E. Rohlsen Airport, Terminal Upgrades

Services Provided:
Industry Type:

The project will add approximately 300 seats to the waiting area along with new air conditioning units, hurricane-rated glass, and other energy-efficient upgrades. The $8.6M project is primarily funded by a $7M disaster recovery grant from the US Department of Commerce-Economic Development Administration, with a local match of $1.6M from the VI Port Authority. It includes enclosing over 6,000 square feet of walkway and open-air space, refurbishing the existing passenger lounge space and restrooms, providing additional concession space, and upgrading the mechanical systems for the new air-conditioned areas. CPC, as a subconsultant to The Green Piece Engineering + Environment (TGP), provided laser scanning of the electrical, fire suppression, and HVAC systems as located by TGP’s Ground Penetrating Radar and exposed lines. Asbuilt plans were prepared to document utility locations prior to the final upgrades within the terminal.

The renovations were completed ahead of schedule in December 2021. The completion of the departure lounge is the first phase of a four-phase, six-year project to expand and modernize the Rohlsen Terminal. The entire project is estimated to cost about $140 million. The next phases will include the construction of jet bridges and the build-out of the second floor of the terminal.