This was a design-build project between Florida City Gas and the project contractor. CPC was responsible for establishing the survey baseline, staking the pipeline route, conducting as-built surveys, providing control, and creating surveys and legal descriptions over private property. CPC directed day-to-day field operations as the resident project surveyor. Coordinating with Florida City’s Gas representatives, the project contractor, as well as various stakeholders along this 30-mile route. As a design-build project for the installation of 30 miles of 6-inch steel high-pressure gas line, this project was completed on a highly compressed schedule. Our field staff utilized the latest technology, including total stations, GPS, and data collection systems, along with necessary CADD skills, to address challenges in real-time, ensuring projects could continue without delay. The resulting information is then sent to the office immediately for accelerated QA/QC and delivery.