John Hart, P.E. (Vice President of CEI) will lead the project team based out of our Stuart office. The project entails the reconstruction of West Martin Highway between Citrus Boulevard/ SW 48th Avenue and SW Martin Downs Boulevard from a 2-lane undivided rural roadway to a 4-lane divided urban roadway. The existing bridge structure over the Turnpike will be widened to increase capacity. Further improvements will include a new closed-drainage system signing, signalization, and lighting upgrades. The final roadway will consist of four 11-foot travel lanes with a raised 22’ median, two 7-foot bike lanes, and 6’ concrete sidewalks on both sides. The final bridge will consist of four 11’ travel lanes with a 19’ raised traffic separator and two 7-foot bike lanes enclosed pedestrian bridge fencing.